Swimming pool enclosure installation.

Insallation of these enclosures is very straighforward. They have been designed for self-assembly, and therefore everything's included - there's even a DVD, to show you one we did earlier!

 


What's included
To ensure you pool enclosure is successfully installed as quickly as possible, we provide a comprehensive package of tools and guidance for you.

This includes:
1. All the tools needed for the installation, with the exception of an electic drill.
2. Full parts list
3. Comprehensive, step by step drawings, following the construction process
4. A DVD showing all the key stages of assembly

We've provided some guidance on how long the pool enclosures take to assemble and install, within the specifications of each enclosure model, however as a general rule, you should allow for two people working between 5 to 7 hours.

Please note: The enclosures are delivered, packaged in a single crate. This is then broken down into a number of smaller packages for unloading. It is advised that you should allow three or four people to unload your enclosure.

Installation service
We are in the process of establishing a mainland Spain network of installers, who will be able to provide a measuring and installation service. If you require this service, please call us and we can let you know if we have anyone in your area. The number is  + 44 (0) 1603 667723       

The installation service can be provided at a cost of £500. This is fully inclusive cost for two people, including all expenses and travel costs.

Materials and construction. The enclosures are of a tough, yet lightweight construction, combining an aluminium alloy framework with double-walled polycarbonate shell. The materials and construction are fully guaranteed for 2 years

 

Installation
Elox surface finish on the frame and sidings. Frame made of aluminium-based AlMgSi Elox surface finish on the frame and sidings. Frame made of aluminium-based AlMgS

 

Extend the pleasure of your summer season and gain the use of your pool throughout the chilly months. You decide on the size and type of your building and leave the design to us. Call today for your no obligation quote. + 44 (0) 1603 667723

,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,.....,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,

Description
Allows one person with an infra red remote control to open and close the telescopic building. Low tension (12v) motor boxes, one on each side, powered by sealed batteries charged by 2 solar panels on the roof of the first moving bay.

Declutching system allows easy reversion to manual operation if desired.

No mains electrical cable needed.

Design and Size

The Sun-Smart pool range is simple and classic in design, allowing the pool surround to reflect the style you wish to achieve. Due to the modular panel structure of Sun-Smart pools, the Sun-Smart range can provide any shape or size, with over ten shapes and sizes of step, or a simple ladder.

....... ......

Sun-Smart are distinguished by their functionality, quality and perfect technical execution.

To describe the whole building process step by step it will take a lot of pages, so we’ll give you the most important stages to let your imagination run thought them and see how the dream will become reality.

  1. Layout position – frame pool to match desired shape.
  2. Excavation – Digger to excavate pool shell, taking soil away if not to be used.
  3. Building perimeter wall along pool shell.
  4. Steel for reinforcing the concrete must be shaped and put in place to form what will become a steel basket.
  5. Fitting incorporated items – main drain, skimmers, jets, lights conduits, makeup line – automatically filling where necessary.
  6. Concrete - height strength concrete is applied with pressure to ensure the highest quality shell.
  7. Interior finish- plastering and tiling pool.
  8. The Coaping or decking around the pool can be of many finishes – paving , tiling or traditional white coaping stone
  9. Building the pump house and installing pool equipment - valving, pump, filter, accessories, all lines are connected to proper inlets and outlets on pool.
  10. Power is run to pump house. Panel is set with breaks and timer. Equipment is hooked up. Lights are installed.
  11. Filling and testing pool.
  12. Surround work – any concrete, paving or tiling can be laid to finish off  the pool area.
  13. Your pool is ready to use!

The duration of the building process from excavation will be four to six weeks, regarding the design and the size of your pool.     

Call today for your no obligation quote. + 44 (0) 1603 667723

 

...

....Pool Refurbishment

Thank you for visiting us!

Sun-Smart offers a no obligation design visit and quotation service - all we ask is that you have a genuine interest in having one of our specialised telescopic pool buildings, and feel comfortable about spending the money!

Our site visits with house owners can last between one and three hours, during which time we will take precise measurements and discuss options suitable for the client and for the site conditions.

The site visit allows us to draw plans for the building and its position relative to the pool. During the visit we will normally make a full technical appraisal and define an exact pricing, so that we can discuss the technical / price configuration fully to your satisfaction.

Options such as the Sun-Smart motor kits can be discussed now or budgeted for adding on later, after installation of the building.

We look forward to the opportunity of welcoming you to our long list of highly satisfied customers!

 

 

   

 

Search TABLE : TruckShipment

  Non-Freight Tracking
PRO#  LIKE    
First Name  LIKE    
LastName  LIKE    

 
   

Click here to email us with your requirements BACK TO TOP

Swimming pool enclosure installation

 
   
Page copy protected against web site content infringement by Copyscape